Sales gas control works by reinjecting the surplus gas not required for sale, which requires gas injectors subordinate to the group. When a group with GCONSALE has no open gas injectors in its subtree, there is no reinjection to adjust. Previously the maximum sales rate procedure (e.g. RATE) would still put the group on GRAT control with a target derived from the sales target, overriding the group's own production controls. The sales gas rate limits are now not enforced in this case, and a warning is issued when a limit is violated. Adds the regression test 9_3G_GAS_EXPORT_NO_GINJ_STW. Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Contributor
There was a problem hiding this comment.
🟡 Changes recommended
GCONSALE handling can leave stale sales-derived production limits after the last gas injector shuts and incorrectly skip enforcement when open injectors exist only in a coupled slave.
2 open issues
What changed in this PR
This PR aims to prevent GCONSALE sales limits from overriding group production controls when no open gas injectors are available for reinjection.
Changes:
- Adds a recursive check for schedule-open gas injectors in a group’s subtree.
- Skips sales-limit enforcement when none are found, warning if a limit is violated.
- Registers the no-gas-injector regression case supplied by OPM/opm-tests#1741.
| File | Description |
|---|---|
| regressionTests.cmake | Registers 9_3G_GAS_EXPORT_NO_GINJ_STW. |
| opm/simulators/wells/BlackoilWellModelGeneric.hpp | Declares the gas-injector availability helper. |
| opm/simulators/wells/BlackoilWellModelGeneric.cpp | Implements the recursive check, enforcement bypass, and warning. |
Review effort: Balanced
When a group loses its last gas injector after a sales gas action has placed it on GRAT control, the cached sales gas target and the GRAT control would otherwise remain and keep production sales-limited. The cached target is now cleared, and a group on GRAT without a gas rate limit of its own falls back to its own production control. The wells of a reservoir coupling slave are not part of the master's schedule, so a reservoir coupling master group is assumed to have gas injectors available. This keeps sales gas control active for coupled groups. Adds the regression test 9_3H_GINJ_SHUT_GAS_MAX_EXPORT_STW, where the last gas injector is shut after the sales gas action. Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Member
Author
|
jenkins build this opm-tests=1742 please |
This branch has not been deployed
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.

Sales gas control works by reinjecting the surplus gas not required for sale, which requires gas injectors subordinate to the group. When a group with GCONSALE has no open gas injectors in its subtree, there is no reinjection to adjust. Previously the maximum sales rate procedure (e.g. RATE) would still put the group on GRAT control with a target derived from the sales target, overriding the group's own production controls. The sales gas rate limits are now not enforced in this case, and a warning is issued when a limit is violated.
Adds the regression test 9_3G_GAS_EXPORT_NO_GINJ_STW (OPM/opm-tests#1741)
Also (after review comments): OPM/opm-tests#1742